Harford Streams
Green Choices. Healthy Streams.
Foster Branch at Stillmeadow Restoration Project
Expected construction start Fall 2020, complete Winter 2021
Harford County is currently preparing a design for stream restoration at this location. The purpose of the project is to improve stream health by stabilizing eroding stream banks, stabilizing failing stormdrain outfalls and increasing tree buffers along the stream.
Pre-construction picture (2017)